Construction of weir boxes of Morvarid petrochemical complex

Construction of weir boxes of Morvarid petrochemical complex

  • Category:Dam construction
  • Client: Morvarid Petrochemical Co.
  • Consultant:Namavaran Delvar Engineering & Construction
  • Location:Asaluyeh
  • Starting Date:02.2015
  • Initial Price:5.250.000 $
  • Progress:100%
  • Completion Date:07.2015
  • Construction of weir boxes of Morvarid petrochemical complex
  • Construction of weir boxes of Morvarid petrochemical complex

The contract duration increased to 7 months and its sum increased to 52.5 billion Rials, too.
The project included the implementation of a system for outgoing warm water evacuation (Bounced MEG ethylene units) in order to enter entering the sea. Furthermore, the task was to install one ABEND wire box, which is a reinforced concrete machine with a height of 15 meters. It includes the input and output ponds along with the related dike walls and two culverts for passing the water pipes. Pipe installation operations took place from the related plants towards the wire box place and includes three carbon steel piping lines in diameters of 73,60 and 40 inches. Also, rust removal and a polyethylene cover on the pipes was performed.